Carrying Out The Foundation Repair Plano Offers

By Sally Delacruz


Buildings should be regularly checked on. The importance of this practice is that the safety of the occupants is ensured. Though it rarely happens, a building may shift its foundation. During such occurrences, it is crucial to have somebody fix it. The expert is tasked with bringing it back to its original position. Sometimes, one may want to increase the depth of the building. This task should be carried out by an expert for quality results doing it on your own may put you into trouble at the end of it all. Consider undertaking foundation repair plano offers.

The need to increase the depth of a foundation may not be necessarily due to a fault in the structure of this building. It might be due to a need to increase the number of stories to an existing building. An increase in the number of stories will result to an increase in the weight of buildings and hence the need for a reinforced base.

There are methods in Dallas that are used to do the underpinning. One of the most commonly used methods is the mass pour method. This entails excavating sections of a structure to a depth that is required below the footing. Concrete is then poured into the pit until all the areas that have been affected have been filled.

Another method that is used to underpin structures is by the use of screw piles and brackets. This is usually used where great depths of excavations are required or where it is not feasible to use other methods. This method is advantageous over other methods since it uses little vibration that could damage the surrounding areas. The installation is also fast and causes little noise.

Many people prefer the underpin method since it does not damage the surroundings. This is because it does not vibrate very much. Therefore, the installation process is quick with minimal noise being produced.

The weight supported by the structures below determines the number of piles used for the procedure. The same weight also determines distance between one pile and the other as well as the depth of the piles. In case the weight below is loose or is not able to offer enough support, more piles must be used for extra support.

The number of piles used is determined by the weight supported by these structures. The weight also determines the distance between piles and their depth. In case the weight is not much, more piles are required so that they can offer extra support.

Just like in the pile and beam method, here piles are placed at locations then areas below the piles are broken. Beams are then used to carry the weight of this wall. Ring beams are then constructed to join all the needle beams and then concrete is poured into the structure.

Whatever method is used, the process should be guided and supervised by a qualified engineer. It is important to note that the process should start from the outside moving inwards. This prevents damage to the structure. The areas that mainly require the repairs are usually the bear the load of the building and cracked sections.